Skip to content
Pravastu Designs

Satara

Building in Satara. Living somewhere else.

Most Satara homes we work on belong to somebody who is not in Satara — which changes almost nothing about the design and everything about how the project has to be run.

The problem is not distance. It is not knowing.

A house four hours away is fine while you can see it. What wears people down is the silence between visits — approving something over a phone call, then driving down a month later to find out whether it happened the way you meant.

So the project reports itself.

You walk the finished house in VR before work starts, approve drawings and materials without travelling, and get photographs of your own site every Friday. You drive down because you want to, not to check.

In detail

How a remote build actually runs

  • A VR walkthrough of the finished house before anything is ordered
  • Drawings, materials and costing approved remotely, in writing
  • Photographs of your site every Friday on WhatsApp
  • One team running design, procurement and execution — nobody to chase
  • Site visits scheduled around when you can actually be there
  • Turnkey handover, so the house is finished rather than nearly finished

Directions

Three that tend to suit it.

Every project starts from one of six. These are the ones this brief usually lands on.

Questions

What people ask first.

And if what you want to ask is not here, it is probably specific to your home — which is the sort of question worth asking a person.

Ask us directly
Can you manage a project in Satara if I live elsewhere?

That is a large part of what the weekly photo updates and the VR walkthrough are for. Plenty of second homes near Panchgani and Mahabaleshwar are commissioned by owners living in Pune, Mumbai or abroad.

Do you work in Satara, or only Pune?

Both. We have a studio in Satara at Powai Naka, and the work there is genuinely different — more bungalows, row houses and second homes than towers, which changes both the design and the way a site runs.

How will I know what is happening on site?

Photographs and a progress note reach you on WhatsApp every Friday, without you having to ask. A running snag list sits alongside it. If something has slipped, you hear about it that week rather than at handover.

How long does a project take?

A typical two or three bedroom turnkey home runs about ten to fourteen weeks on site, after the design is frozen. Design itself usually takes three to five weeks depending on how quickly decisions are made. We give you a dated programme before you sign anything.

Plan it from wherever you are.

Tell us where the plot or the house is and roughly when you want to be in it. Distance is a logistics problem, and it is ours.